National Water Academy
        Online Training Activities Database

  Home Page | Data Availability Chart | Programme Info | Trainee Officer Info | Faculty Info | Search


SCHEDULE

Name of the Programme : Hydrological Design Aids

Durartion : 29/6/2009 to 3/7/2009

 
Date
Session
SessionTime
SessionType
SessionTopic
Faculty
29/6/2009
I
9:30-11:00 Lecture Registration / Introduction R K Suryawanshi, Director (Systems )
29/6/2009
II
11:30-13:00 Lecture Stochastic Hydrology C M Pandit, Chief Engineer (NWA )
29/6/2009
III
14:00-15:30 Lecture Hydro-met design parameters N R Deshpande, Scientist ( )
29/6/2009
IV
16:00-17:30 Lecture -do- N R Deshpande, Scientist ( )
30/6/2009
I
9:30-11:00 Lecture Hydrological Design Parameter - I R K Suryawanshi, Director (Systems )
30/6/2009
II
11:30-13:00 Lecture Hydrological Design Parameter - II R K Suryawanshi, Director (Systems )
30/6/2009
III
14:00-15:30 Lecture Hydrological Design Parameter - III V. G. Kulkarni, Executive Engineer (Irrigation Deptt. )
30/6/2009
IV
16:00-17:30 Lecture Hydrological Design Parameter - IV V. G. Kulkarni, Executive Engineer (Irrigation Deptt. )
1/7/2009
I
9:30-11:00 Lecture Hydrological Design Parameter - V V. G. Kulkarni, Executive Engineer (Irrigation Deptt. )
1/7/2009
II
11:30-13:00 Lecture Hydrological Design Parameter - VI V. G. Kulkarni, Executive Engineer (Irrigation Deptt. )
1/7/2009
III
14:00-15:30 FieldVisit Local Visit - Panshet / Varsgaon
1/7/2009
IV
16:00-17:30 FieldVisit Local Visit - Panshet / Varsgaon
2/7/2009
I
9:30-11:00 Lecture Water Quality Parameter R N Sankhua, Deputy Director (NWA )
2/7/2009
II
11:30-13:00 Lecture River Morphological parameters Anup Kumar Srivastava, Deputy Director((H&WR)), National Water Academy
2/7/2009
III
14:00-15:30 Lecture HIS for Basin Management - I R K Suryawanshi, Director , Systems
2/7/2009
IV
16:00-17:30 Lecture HIS for Basin Management - II R K Suryawanshi, Director , Systems
3/7/2009
I
9:30-11:00 Lecture GW Hydrological Parameters U R Patankar, ,
3/7/2009
II
11:30-13:00 Lecture GW Hydrological Parameters U R Patankar, ,
3/7/2009
III
14:00-15:30 Vale Feedback and distribution of Certificates R K Suryawanshi, Director(Sys), Systems