National
Water Academy
Online Training Activities Database |
SCHEDULE
Name of the Programme : Pumped Storage Hydroelectric Projects
Durartion : 8/1/2024 to 12/1/2024
|
Date
|
Session |
SessionTime
|
SessionType
|
SessionTopic
|
Faculty
|
| 8/1/2024 |
I
|
10:00-11:15 | Lecture | Pumped Storage Hydroelectric Projects in India- An Overview | Sharvan Kumar, Chief Engineer , Central Electricity Authority |
| 8/1/2024 |
II
|
11:45-13:00 | Lecture | Power Potential studies and fixation of Installed Capacity for Pumped Storage Hydro Electric Projects | Aravind Reddy, Assistant Director , Central Electricity Authority |
| 8/1/2024 |
III
|
14:15-15:30 | Lecture | Hydrology and Planning of Pumped Storage Hydro Electric Projects | N N Rai, Director , CWC |
| 8/1/2024 |
IV
|
16:00-17:15 | Lecture | Geotechnical Investigation for Pumped Storage Hydro Electric Projects | Dharmender Pandey, Senior Geologist , Geological Survey of India |
| 9/1/2024 |
I
|
10:00-11:15 | Lecture | Preliminary Design Aspects of Pumped Storage Hydroelectric Projects for Dam and Storage | S K Sinha, Director , Training dte. |
| 9/1/2024 |
II
|
11:45-13:00 | Lecture | Preliminary Design Aspects of Pumped Storage HE Projects for Water Conductor system, transient phenomenon & Powerhouse | S K Das, Director ( HCD (NW&S) ) , CWC, ND |
| 9/1/2024 |
III
|
14:15-15:30 | Lecture | Plant Layout of Powerhouse in Pumped Storage HE Projects | Ajay Konnur, Head of Department , Bhira Tata Power |
| 9/1/2024 |
IV
|
16:00-17:15 | Lecture | Preliminary Design Aspects of Electromechanical Equipment in Pumped Storage HE Projects including Reversible Pump Turbine | Ajay Konnur, Head of Department , Bhira Tata Power |
| 10/1/2024 |
I
|
10:00-11:15 | Lecture | Planning and Design of Hydromechanical Equipment for Pumped Storage HE Schemes | Rahul Kumar Singh, Director , Gates (NW&S) Directorate |
| 10/1/2024 |
II
|
11:45-13:00 | Lecture | Bhira Pumped Storage Hydro Electric Projects- A case study | Ajay Konnur, Head of Department , Bhira Tata Power |
| 10/1/2024 |
III
|
14:15-15:30 | Lecture | Challenges in Preparing and evaluation DPR for PSP | Amit Roy Singhal, Deputy Director , Central Electricity Authority |
| 10/1/2024 |
IV
|
16:00-17:15 | Lecture | Financial viability including tariff of Pumped Storage Scheme | Chander Prakash, Assistant Director , Central Electricity Authority |
| 11/1/2024 |
I-IV
|
10:00-17:15 | FieldVisit | Visit to Bhira HE Project | |
| 12/1/2024 |
I
|
10:00-11:15 | Lecture | Model Studies for Pumped Storage Hydroelectric Project taken by CWPRS | |
| 12/1/2024 |
II
|
11:45-13:00 | FieldVisit | Visit to CWPRS for Models related to Pumped Storage Hydro Electric Projects including Mathematical Modelling taken by CWPRS | |
| 12/1/2024 |
III
|
14:15-15:30 | Lecture | New Technologies/Turbine in Pumped Storage HEP (Online) | Rohit Oberoi, Vice-President , Andritz Hydro Power Pvt Ltd |
| 12/1/2024 |
IV
|
16:00-17:15 | Lecture | Global and Indian Policy Framework for Sustainable Pumped Storage Scheme | Nilesh Gurunath Bhoir, Suprintending Engineer , WRD |
| 12/1/2024 |
V
|
0.00-0.00 | Vale | Feedback and Valedictory |